Voyager Textile

Full-package vs CMT apparel manufacturing

CMT and full package differ in who sources the materials and which production services are included. Under CMT, the buyer supplies fabric and usually trims; under full package, the manufacturer sources them and produces finished garments. Hybrid arrangements are also possible. Agree the scope, payment terms and responsibilities in writing.

Contents

Production terms can cover different services at different suppliers. Compare the written list of sourcing, development, manufacturing and delivery responsibilities for each offer.

What each model means

CMT stands for cut, make and trim. The buyer supplies the fabric and usually the trims, and the factory converts them into finished garments. The factory sells labour and capacity.

Under full package, the manufacturer sources the materials and produces finished garments. Agree material specifications, purchasing and payment terms, quality responsibilities and delivery terms as part of the order.

How responsibility divides

ActivityCMTFull package
Fabric sourcing and purchaseBuyerManufacturer
Trim and component sourcingBuyer, usuallyManufacturer
Pattern and technical filesBuyer, usually supplied completeEither, often the manufacturer
SamplingManufacturer, from supplied materialsManufacturer, including material sourcing for samples
Material delivery coordinationBuyerManufacturer
Material quality coordinationBuyerManufacturer
Production and finishingManufacturerManufacturer
Quality coordinationShared, buyer usually leadsManufacturer, against the agreed standard
Packing and export documentationVariesManufacturer
FreightBuyer, usuallyDepends on the Incoterm agreed
Illustrative coordination roles, subject to the agreed scope. Record ownership, payment terms and responsibility for defects separately; a production-model label alone does not determine them.

What each model demands from you

Assess your team’s sourcing capacity, technical support and cash-flow requirements alongside the total cost.

Internal resources required

CMT expects you to have

  • Fabric sourcing relationships, or a mill you already buy from
  • The ability to specify, order and inspect materials yourself
  • Someone who can plan material delivery against a production slot
  • Complete technical files, or separately agreed product-development support
  • Funding for materials under the agreed supplier payment terms
  • An agreed process for inspecting materials, reporting defects and resolving responsibility

Full package expects you to have

  • A clear specification of the product you want
  • A designated approver for fabric, colour and samples
  • Agreement on supplier selection, including any suppliers nominated by you
  • A budget for the agreed materials and sourcing services
  • A quality standard agreed in writing

Cost visibility, which is not the same as cost

CMT looks cheaper because the quotation covers only conversion. It is not necessarily cheaper in total: the fabric cost simply appears on your own purchase ledger instead of the factory's invoice, along with the freight, the wastage and the money tied up while the material waits.

A full-package price can combine materials and manufacturing services. Request a breakdown and compare total cost per delivered garment on the same basis, including material wastage, freight, financing and your team’s work. Agree payment and risk terms separately.

What actually drives the underlying cost in either model is the same set of lines, and they are covered in the cost guide.

Where each model genuinely fits

SituationOption to considerWhy
You already own mill relationships and buy fabric at volumeCMTRetains your existing purchasing relationships and negotiated material terms
The fabric is proprietary or developed exclusively for youCMTYou control the material and who may buy it
You are a brand without sourcing staffFull packageProvides sourcing support where the brand has no dedicated team
First order with a new factoryFull packageAllows sourcing and garment production to be coordinated with one supplier
Programme spans several fabrics and garment typesFull packageThe manufacturer coordinates the agreed material purchases
Cash is tight and material cost is the largest exposureCompare payment terms under both modelsDeposits and payment milestones determine when cash is needed
You need absolute control of a specific mill qualityCMT, or full package with a nominated supplierSelect the material source and agree purchasing and quality responsibilities

Hybrid arrangements

One hybrid is full package with nominated suppliers: the manufacturer buys from a mill or trim supplier selected by the buyer. Specify who places and funds the orders, approves materials, handles defects and coordinates delivery. Nomination alone does not settle these responsibilities.

Other common hybrids include buyer-supplied trims within an otherwise full-package order, usually for branded hardware or labels, and CMT with the factory sourcing minor trims for practicality.

Questions that settle the scope

Ask before comparing two quotations

  • Who buys the main fabric, and who funds and stores it if the order is delayed
  • Who buys trims, labels and packaging
  • Whether specific suppliers are nominated, and by whom
  • Who develops the pattern, and who owns it afterwards
  • Who pays for sampling, and how many rounds are included
  • Who arranges and pays for testing, and against which standard
  • Who is responsible if the material is faulty
  • What the price includes, and which Incoterm it is quoted on
  • Who arranges freight and export documentation

Use the agreed scope to compare quotations on equivalent terms. Further guidance: RFQ guide.

How Voyager Textile works

Voyager Textile is a direct manufacturer and exporter producing to customer specification, and normally sources materials as part of the project, including fabric, custom colour development, trims, labels and packaging. Where a buyer has an existing mill relationship or a nominated supplier, that can be built into the arrangement instead. The practical answer is agreed per project rather than fixed, and it belongs in the quotation rather than in a category name.

Questions this raises

What does CMT stand for?

Cut, make and trim. The buyer supplies the fabric and usually the trims, and the factory converts them into finished garments, selling labour and capacity rather than a product.

Is CMT cheaper than full package?

A CMT quotation usually excludes buyer-supplied materials. Whether the total is lower depends on your material price, wastage, freight, financing and the cost of your own sourcing time. Compare landed cost per delivered garment rather than the two quotations directly.

Is FOB the same as full package?

No. FOB is an Incoterms rule for sea or inland waterway transport, with delivery on board the vessel at the named port of shipment. It does not define sourcing or manufacturing services. Specify those services separately in the quotation.

Can I supply my own fabric to a full-package manufacturer?

Buyer-supplied fabric can be agreed as a hybrid arrangement. It differs from supplier nomination, where the manufacturer purchases from a source you select. Confirm material suitability, purchasing, inspection and delivery responsibilities with the manufacturer before ordering.

Which model is better for a new brand?

Full package can suit a brand that needs material-sourcing support. Compare your team’s capabilities, material requirements, payment terms and total cost before choosing. A new brand with established fabric suppliers may instead consider CMT or a hybrid arrangement.

Who is responsible if the fabric is faulty?

The production model alone does not determine liability. Assess the agreed material specification, cause of the defect, inspection obligations, contract and applicable law. Record how faults are reported, investigated and remedied, including defects found after cutting or sewing.

Comparing two quotations built on different models?

Send both scopes and we will tell you plainly what each one includes and what is missing from each, so the comparison is like for like before you decide.

Ask for a scope comparison

Continue with